Hecate Strait · 54.0°N 131.2°W · northwest British Columbia

The wind off BC’s north coast is among the strongest on Earth.

Oceanic Wind is developing an offshore wind project in Hecate Strait with Coast Tsimshian Enterprises, a partnership of the Metlakatla and Lax Kw’alaams First Nations.

Wind speed10.2m/saverage above 10 m/s
Winter capacity factor65%+when BC needs power most
First phase600–700MWIUP granted July 2025
To Prince Rupert~30kmby submarine cable

Move across the sea to shift the wind. Readout is an illustration based on published averages.

What brings you to Oceanic Wind?

Choose one and we’ll guide you to what matters most. You can switch at any time.

The site · 1 of 4

Between Haida Gwaii and the mainland.

Hecate Strait separates Haida Gwaii from British Columbia’s north coast. Its open water funnels some of the strongest, most consistent winds in the world.

The site · 2 of 4

West of Stephens Island.

The turbines would stand on the east side of Hecate Strait, west of Stephens Island, in Lax Kw’alaams and Metlakatla First Nation territory.

The site · 3 of 4

An Investigative Use Permit, secured.

In July 2025, Oceanic Wind and Coast Tsimshian Enterprises were jointly granted an Investigative Use Permit for the first phase of development, targeting 600 to 700 MW.

The site · 4 of 4

Power ashore at Prince Rupert.

Submarine cables would connect the project to the Prince Rupert Substation, about 30 km to the east, close to the Port of Prince Rupert and a growing industrial region.

Project area traced from Oceanic Wind’s published site map. Approximate.

The resource

A little more wind is a lot more power.

Power in the wind grows with the cube of its speed. That is why Hecate Strait matters: an average above 10 m/s carries roughly twice the power of an 8 m/s site.

8 m/s reference

1.95× the power of an 8 m/s site

Class 7wind conditions, with low shear and turbidity
55%+annual capacity factor
65%+winter capacity factor, when BC’s demand peaks
97%of the time the project could produce power
Monopileshighly compressed seabed soils suit the lowest-cost fixed foundations

The scale

Fewer turbines. Far more power.

A 400 MW project would need about 33 turbines today, nearly 80 fewer than a decade ago. Larger machines mean fewer foundations, fewer cables and lower maintenance.

The outlook

British Columbia needs more clean power, and it needs it in winter.

Where BC’s energy comes from today

~70% hydrocarbons<20% BC Hydro

To meet CleanBC targets, those numbers need to reverse.

  1. +15%electricity demand expected by 2030, about 3.6 GW at a 50% capacity factor
  2. ~20%of BC’s power is imported from the USA, the equivalent of two Site C dams
  3. 100%clean or renewable electricity is the Province’s target for the integrated grid by 2030
  4. Dec 2024BC exempted future wind projects from comprehensive environmental assessment

Partners

Built in partnership, from the water up.

Indigenous partner

Coast Tsimshian Enterprises

A 100% Indigenous-owned, 50/50 partnership of the Metlakatla and Lax Kw’alaams First Nations. CTE and Oceanic Wind jointly hold the Investigative Use Permit, in what could be one of Canada’s largest Indigenous renewable energy opportunities.

Strategic MOU · May 2026

Ming Yang Smart Energy

A global offshore wind technology group, evaluating equity investment, debt financing and strategic support under a non-binding MOU with a 90-day due diligence period.

Investment · 2024

Elemental Energy

An investment agreement in the Hecate Strait project, bringing a new partner and funding to advance development.

Environmental · 2026

Falkirk Environmental

Retained to begin the environmental approvals process, starting with the Initial Project Description.

“This agreement reflects the growing international confidence in Indigenous partnerships in clean energy development in Canada.”Michael O’Connor, P.Eng., President and CEO

Progress

From development rights to a permit and a partner.

Development rights returned

Oceanic takes the lead role in developing the Hecate Strait project.

Elemental Energy invests

Investment agreement completed; shareholder approval follows in September.

Permit application accepted

Joint IUP application with Coast Tsimshian Enterprises is accepted. BC exempts wind projects from comprehensive environmental assessment.

Crown land tenure

Acceptance of the Crown land tenure application announced.

IUP granted

Investigative Use Permit secured for a first phase of 600 to 700 MW.

Ming Yang MOU

Strategic investment partnership MOU signed; Falkirk Environmental retained.

Initial Project Description

Preparing and submitting the IPD to begin the environmental approvals process.

Leadership

People who have delivered energy and infrastructure at scale.

Get in touch

Let’s talk about Hecate Strait.

Tell us who you are and what you’d like to discuss. Your message goes directly to the President and CEO.

Emailmoconnor@oceanicwind.ca Phone+1 604 631 4483

Office720 – 999 West Broadway, Vancouver, BC V5Z 1K5

Opens your email with everything filled in.